top of page
Tennessee-Nashville-COMPOSITE_TRACKOUT_DEVICE_ROCKLESS-CONSTRUCTION-ENTRANCE_TRACK-OUT-DEV
FODS.png

FODS

(Foreign Object Debris System)

  • Effective cleaning: The unique pyramid design effectively removes mud, debris, and rocks from tires, minimizing trackout onto roadways and surrounding areas.

  • Durable and long-lasting: Made from high-density polyethylene (HDPE), FODS mats are built to withstand heavy

  • Environmentally friendly: FODS mats are chemical resistant, UV stable, and
    recyclable, minimizing environmental impact.

  • Protects ground: Compared to rock pads, FODS mats are gentler on the
    underlying surface, preventing damage to asphalt, gravel, or soil.

  • Compliance: They help construction sites comply with regulations regarding
    sediment control and trackout prevention.

  • Highly visible: The bright white color makes the entrance clearly visible to
    drivers, day or night, improving safety.

A rock trackout pad costs between $2000 and $3500 to install, plus another $750 on average to refresh, usually monthly or bi-weekly. Then, if you have to get it removed before paving, it's another $1500 for the removal. For a six month project, you are looking at between $8000 and $14000 for a rock trackout pad. That's not factoring in any extra street sweeping because rock trackout pads are not highly effective.

We will provide a 4 piece (3T) FODS trackout pad solution for $1200 per month, including installation and retrieval. On your 6 month project, that's a savings of between $800 and $6800, Plus what you'll save on Street Sweeping costs.

bottom of page